how do i compare two quotes fairly? the line-by-line method

business · 2026-10-13 · 5 min

you asked two professionals for a website quote. one says 1200, the other says 6000. both smiled. both seemed competent. at least one of them must be scamming you, except usually neither is: they quoted different things. comparing quotes without a shared scope is comparing confidence, not offers.

step zero: send the same scope to both

before comparing, make them quote the same thing. one page describing: the pages, who writes the words, who provides photos, the features (form, booking, shop, languages), the deadline, and what happens after launch. a quote received against different assumptions is not a data point. send the scope, ask for requotes, then compare. this single step resolves half of all quote mysteries.

the eight lines to check

deliverables, named. homepage, services, proof, about, contact: named pages, not a website. count them on both quotes.

content: who writes. the words are half the project. if one quote includes copywriting and the other assumes you deliver finished text, the cheaper one is missing a thousand euros of work you will do at midnight.

design: template or custom. a template with your logo at person prices is the classic trap. ask directly. custom means designed for your content. template means arranged.

revisions: how many, what kind. two rounds of real revisions is normal. unlimited revisions means nothing is ever finished. zero mentioned means the first draft is the last draft.

technical: mobile, speed, seo basics. responsive, load-time attention, titles, sitemap, analytics. if a quote does not mention them, you are not getting them.

launch: domain, hosting, email, measurement. who sets up what, in whose account. unowned accounts are the most expensive line on any cheap quote.

after launch: maintenance and changes. what the first year costs, how change requests are priced. the yearly bill is detailed in what recurring costs does a website have.

exclusions. the most honest paragraph in any quote. no exclusions listed means the exclusions are unwritten, not absent.

the red flags

a quote with no questions asked first: they are selling hours, not outcomes. a price far below everyone else with no explanation of what is excluded: the exclusions will arrive as invoices. pressure to sign this week: scarcity is a sales tool, not a project constraint. and anyone guaranteeing google positions: no one can, and saying so disqualifies the rest of the document.

FAQ

is the cheapest quote ever the right one?

when the scopes match and the portfolios both show live work of similar complexity. price is information once scope is equal. before that it is noise.

should I show each bidder the other's price?

show the scope, not the price. you want their honest number, not their undercut number. an undercut quote is a project that starts with a lie about its own cost.

for a quote built this way from the start, with exclusions written down: web development in Parma.